In a very wet and windy start to 2020 (more on that later) the focus was on the Annex, with the lime plastering well underway and a new door frame installed to the main room:
The wet weather and storms caused a few issues:
One of which was extensive tree damage, including one mature specimen that had to be felled mid-storm:
And, of course, the snow didn’t help!
In between all of the chaos, we did progress the drains and other services for the outbuildings:
And, of course, the garden kept ticking along, with an early first cut for the grass, a lot of branches to run through the chipper, a lot of weeding, some new raspberry canes, restocking of the wood store and even getting the potatoes in:
Not much to report inside the house – just a few door handles installed in the laundry. Hopefully more to report next time!